Street Northeast Mobility Cham Island

The total route length of 11 km construction. Structural concrete pavement M300, 22cm thick, macadam base course 20 cm thick type I, lu K98, hilly gravel road base 30 cm thick compacted K95; Two roadside 1m wide each side by stone 25cm thick M100 mortar. Sewer along with trapezoidal groove and the drainage culvert equal, round shaped concrete sewer M200. Traffic safety systems designed on-line synchronization. Value of works 149.815 billion VND