Marina access road and ship maneuverability Cam Binh island commune
The total length of roads constructed over 3 km. Structural concrete pavement M300; Two roadside reinforced with stone construction. Sewer along with trapezoidal groove, triangles and horizontal drainage culverts with concrete shape, the drain, the drain box. Traffic safety systems designed along synchronously.
Works were completed and handed over to the investor in 2012, contributing to economic development - social Khanh Hoa province in particular and neighboring provinces in general.